Fuel storage plant in Galicia
DBA FERROL PORT
This project is currently under development. It is scheduled to open in 2024.
Location:
Cabo Prioriño, Puerto Exterior de Ferrol, 15593 Ferrol, A Coruña
Plant advantages:
Storage:
12
aboveground tanks
85.000 m3
of storage capacity
22.113 m2
of surface
Adaptation:
- Pipeline connection to the dock: TBD.
- Maximum draft: 20 metres.
- Maximum length: Any ship.
- Products stored: diesel, petrol, FAME.